How is the long-term corrosion rate worked out?

Print these cards (PDF) · cut-out sheets: print double-sided, flip on the long edge

Send these free cards to a coworker.

The course has 72 cards with spaced review.It also adds every question you miss to your deck.

Terms and refunds · Secure checkout by Stripe · Billed by Nori Software

Not sure where to start? Take the free 10-question check.

All 12 cards

The same signed cards as the trainer above, in one list to read or print.

How is the long-term corrosion rate worked out?
Thickness loss between the first and the latest reading, divided by the years between them.API 510, the part on evaluating inspection data (corrosion rate and remaining life)
How is the short-term corrosion rate worked out?
Thickness loss between the two most recent readings, divided by the years between them.API 510, the part on evaluating inspection data (corrosion rate and remaining life)
Long-term and short-term rates differ. Which one governs?
The one the inspector judges best reflects current and expected process conditions. It is a judgement, not automatically the higher or lower.API 510, the part on evaluating inspection data (corrosion rate and remaining life)
How is remaining life calculated?
Remaining life = (actual thickness - required thickness) / corrosion rate.API 510, the part on evaluating inspection data (corrosion rate and remaining life)
Readings 0.552 in. then 0.504 in. six years apart. Short-term rate?
(0.552 - 0.504) / 6 = 0.008 in./yr.API 510, the part on evaluating inspection data (corrosion rate and remaining life)
Actual 0.504 in., required 0.440 in., rate 0.008 in./yr. Remaining life?
(0.504 - 0.440) / 0.008 = 0.064 / 0.008 = 8.0 years.API 510, the part on evaluating inspection data (corrosion rate and remaining life)
A rate is given in mpy. How do you use it with thicknesses in inches?
Divide by 1,000: 1 mpy is 0.001 in./yr. 5 mpy is 0.005 in./yr.API 510, the part on evaluating inspection data (corrosion rate and remaining life)
A vessel has several CMLs. Which one sets the vessel's remaining life?
The CML with the shortest remaining life, which is not always the thinnest or the fastest-corroding one.API 510, the part on evaluating inspection data (corrosion rate and remaining life)
Actual 0.300 in., rate 0.010 in./yr. Projected thickness in 4 years?
0.300 - 4 x 0.010 = 0.260 in. Compare it with the required thickness before setting the next date.API 510, the part on evaluating inspection data (corrosion rate and remaining life)
What is the default internal or on-stream inspection interval?
Half the remaining life or 10 years, whichever is less.API 510, the part on inspection and testing intervals
Remaining life 8 years. Default internal interval?
Half of 8 is 4 years, which is under 10, so 4 years.API 510, the part on inspection and testing intervals
Remaining life 30 years. Default internal interval?
Half is 15 years, but the cap is 10, so 10 years.API 510, the part on inspection and testing intervals